Saturday, January 1, 2011

1. This is all the materials I have gathered so far, in the front kitchen.


 2. Here you can see the left side of the basement.



 3. And this is the right side.



 4. This is where the "wet" side of things will be, I think.


 5. And over on this table, I should be able to get an enlarger and trays and so on. Off to the left there are water spickets.


 6. This is where I originally considered placing the most important part - Hanging the film to dry. No such luck, as these run hot liquids throughout the house.


 7. I finally decided to places the wire here, and a pan on the floor will catch any dripping water. This is right behind the "wet" side of the basement. I used cotton twine and really wound it up. The basement is dusty as is, and I DO NOT want my film on this floor. EVER... EVER!


 8. A game of Horseshoes, anyone?


 9. My hands after the ordeal.


No comments:

Post a Comment